New Mexico Electrician License: Requirements, Exam and How to Apply, New Mexico Electrician License, New Mexico, Residential/Commercial Electrical, EE-98 through the NASCLA exam, New Mexico Regulation and Licensing Department, how to get a New Mexico Electrician License, New Mexico Electrician License requirements, New Mexico Electrician License exam, New Mexico licensing board, New Mexico contractor license, license application steps, exam reference books, B&L + NASCLA Electrical, Experience, Not listed separately, Trade exam, NASCLA Electrical exam

Home Licenses Electrician License New Mexico

Electrician License · EE-98 Residential & Commercial

New Mexico Electrician License: Requirements, Exam and How to Apply

This guide walks through what it takes to earn New Mexico’s EE-98 Residential/Commercial Electrical license: experience, the four exams, how to apply and the continuing education you need to stay licensed.

Last updated October 27, 2026 from New Mexico Regulation and Licensing Department requirements

Exam time

~9.5 hrs

EE-98 Parts 1, 2 and 3 plus Business & Law

Time to get license

~4 yrs

You need 4 years (8,000 hours) of experience

Continuing ed

16 hrs

This license requires it

Do you need a New Mexico electrician license?

It is if you contract for electrical work in New Mexico. The state combines residential and commercial electrical work into one classification, the EE-98, which covers most wiring up to 5,000 volts. The first list below shows what’s included; the second shows what isn’t.

You need the license when

  • Any electrical wiring you contract for that operates at 5,000 volts, nominal, or less
  • Residential wiring (the ER-1 classification comes with the EE-98)
  • Work in the ES-1, ES-2, ES-3 or ES-7 electrical specialty classifications
  • Bidding as the prime contractor when electrical is the largest piece of the project contract

Exceptions

  • Apart from trenching and ductwork, EL-1 work falls outside the EE-98
  • If the electrical work isn’t the largest share of the contract by dollar amount, you can’t be the prime contractor

Penalties for working without a license

We couldn’t confirm specific penalties. As a rule, contracting without the proper license can bring fines and disciplinary action from the state, so get your license before you bid or begin a job.

How to get a New Mexico electrician license in 6 steps

  1. Build your experience Before applying
    Before going after the EE-98, get 4 years (8,000 hours) of electrical experience.
  2. Book your PSI exams Before exam day
    Call 855-807-3994 or schedule online in PSI’s exam catalog for New Mexico. You’ll find test centers in the bigger cities around the state.
  3. Pass the trade exam and Business & Law Exam day
    Sit Business & Law and the three EE-98 parts: Part 1 (Commercial and Industrial), Part 2 (Residential) and Part 3 (Specialties). Every exam is open book, and each one takes 75% to pass.
  4. Get approved as a Qualifying Party Before applying
    Because the license is issued through an approved Qualifying Party, check that you meet that requirement before you send anything in.
  5. Send in your application Once you pass
    Your pass details arrive by email. Following the Regulation and Licensing Department instructions, mail or hand-deliver the complete, signed application with the license fee and required documents to PSI’s Albuquerque office.
  6. Stay on top of CE Each renewal
    This license requires 16 hours of continuing education.

New Mexico electrician application checklist

Everything for the New Mexico application on one page

  • Documented experience of 4 years (8,000 hours)
  • Passed EE-98 Parts 1, 2 and 3 (or NASCLA Electrical)
  • Passed Business & Law
  • Qualifying Party approval
  • Complete, signed application and required documents
  • License fee

New Mexico electrician license classes

One license, the EE-98, rolls commercial, residential and several specialty classifications together. You can qualify in two ways: pass the state’s three-part trade exam, or, if another state already licenses you, take the NASCLA Electrical exam.

EE-98 Most common

Residential/Commercial Electrical

Covers all wiring at 5,000 volts or less, along with ES-1, ES-2, ES-3, ES-7 and ER-1 work and the trenching and ductwork that goes with EL-1.

ExamB&L + EE-98 Parts 1–3
LimitNot stated

NASCLA Licensed elsewhere

EE-98 through the NASCLA exam

If you’ve been licensed in another state for 1 year or more, you can sit the NASCLA Electrical exam in place of the state trade exam (an option since January 2023).

ExamB&L + NASCLA Electrical
LimitNot stated

Requirements for each New Mexico electrician class

You end up with the same EE-98 either way. What differs is the trade exam you sit and whether you already need a license from another state.

RequirementState exam routeNASCLA exam route
Experience4 years (8,000 hours)Not listed separately
Trade examEE-98 Parts 1, 2 and 3 (75%)NASCLA Electrical exam
Business & Law examRequired, pass with 75%Required, pass with 75%
License from another stateNot neededHeld 1 year or more
Qualifying PartyApproval requiredApproval required
ApplicationComplete and signedComplete and signed
Minimum ageNot statedNot stated

The New Mexico electrician exam

You’ll sit four exams for the EE-98: a three-part trade exam and Business & Law. All are open book and you may tab and highlight the approved references, so knowing where things are in your books counts as much as knowing the content.

Format

Open book

Questions

50 + 80 + 40 + Part 3

Passing score

75%

Exam vendor

PSI

Scoring and content

  • Business & Law: 130 minutes for 50 questions, pass with 75%
  • Part 1 (Commercial and Industrial): 200 minutes, 80 questions
  • Part 2 (Residential): 100 minutes, 40 questions
  • Part 3 (Specialties): 135 minutes, pass with 38 correct
  • Approved references include NFPA 72 (2019), NESC 2007, NEC 2020 and the NM Electrical Code (14.10.4 NMAC)

Retakes

  • A retake is $89.69 for each EE-98 part and $68.88 for Business & Law; we couldn’t confirm any waiting period
  • Book or change exam dates with PSI at 855-807-3994
  • If another state has licensed you for 1+ year, the NASCLA Electrical exam can stand in for the state trade exam (since January 2023)
  • Both routes require Business & Law

Books and codes for this exam (open book)

New Mexico’s electrical exams are open book: the approved references can be tabbed, highlighted and brought into the PSI testing center. The list covers EE-98 Part 1 (Commercial and Industrial), Part 3 (Specialties) and the Business and Law exam, plus books that are useful for study but not allowed in the room.

ReferenceEditionHow it’s used
NFPA 70: National Electrical Code (NEC) — Part 1 (Commercial and Industrial)2020Allowed in exam
National Electrical Safety Code (NESC) — Part 1 (Commercial and Industrial)2007Allowed in exam
New Mexico Electrical Code (NMAC 14.10.4) — Part 1 (Commercial and Industrial)2020Allowed in exam
NFPA 72: National Fire Alarm and Signaling Code — Part 3 (Specialties)2019Allowed in exam
NASCLA Contractor’s Guide to Business, Law and Project Management, Basic Edition — Business and Law examBasic EditionAllowed in exam
American Electricians’ Handbook — Part 117th editionStudy only
Ugly’s Electrical References — Part 12023Study only
Lineman’s and Cableman’s Handbook — Part 1Not statedStudy only
Ugly’s Electrical References — Part 2 (Residential)2020Study only
Telecommunications Wiring — Part 33rd editionStudy only
Understanding and Servicing Alarm Systems — Part 33rd editionStudy only
BICSI Telecommunications Distribution Methods Manual — Part 3Not statedStudy only
Live Sound Reinforcement — Part 3Best Seller EditionStudy only
Data, Voice and Video Cabling — Part 33rd editionStudy only

The sources we checked don’t list the permitted references for Part 2 (Residential) separately, so check the PSI candidate bulletin; candidates with a year of licensure in another state may take the NASCLA Electrical exam instead of the state trade exam.

Prep for the New Mexico electrician exam

Our exam prep course, Total Prep and complete bundle for the New Mexico electrician exam. Prices are coming soon.

Books for this exam

Renewing your New Mexico electrician license

Keeping your EE-98 takes 16 hours of continuing education. A contractor license lasts three years, and renewing costs $300, the same EE-98 classification fee you paid at the start. If you renew late, it’s $1 a day for the first 30 days; from 30 to 90 days it’s the equivalent of one year’s fee. Past 90 days, the license is cancelled.

Renewal cycle

3 years

CE hours

16

Renewal fee

$300

Late penalty

$1/day (1–30 days)

New Mexico electrician CE

Hours, deadlines, required topics and the renewal steps, in one guide.

Licensed in another state?

For journeyman licenses, New Mexico has reciprocity with 11 states. If you’re licensed elsewhere and want the EE-98 itself, the NASCLA Electrical exam is the main shortcut.

Alaska: journeyman reciprocity

This agreement applies to journeyman licenses. Ask the Regulation and Licensing Department how it fits your case.

Arkansas: journeyman reciprocity

This agreement applies to journeyman licenses. Ask the Regulation and Licensing Department how it fits your case.

Colorado: journeyman reciprocity

This agreement applies to journeyman licenses. Ask the Regulation and Licensing Department how it fits your case.

Idaho: journeyman reciprocity

This agreement applies to journeyman licenses. Ask the Regulation and Licensing Department how it fits your case.

Montana: journeyman reciprocity

This agreement applies to journeyman licenses. Ask the Regulation and Licensing Department how it fits your case.

Nebraska: journeyman reciprocity

This agreement applies to journeyman licenses. Ask the Regulation and Licensing Department how it fits your case.

Oklahoma: journeyman reciprocity

This agreement applies to journeyman licenses. Ask the Regulation and Licensing Department how it fits your case.

South Dakota: journeyman reciprocity

This agreement applies to journeyman licenses. Ask the Regulation and Licensing Department how it fits your case.

Texas: journeyman reciprocity

This agreement applies to journeyman licenses. Ask the Regulation and Licensing Department how it fits your case.

Utah: journeyman reciprocity

This agreement applies to journeyman licenses. Ask the Regulation and Licensing Department how it fits your case.

Wyoming: journeyman reciprocity

This agreement applies to journeyman licenses. Ask the Regulation and Licensing Department how it fits your case.

Any state: NASCLA exam instead of the trade exam

Licensed in another state for 1 year or more? Then you can sit the NASCLA Electrical exam in place of EE-98 Parts 1–3. Business & Law is still required.

City and county rules in New Mexico

The Regulation and Licensing Department issues the EE-98 as a state license. We couldn’t confirm any city or county licensing rules, so check with your local office before pulling permits.

The state handles

  • EE-98 licenses and classifications
  • Approving Qualifying Parties
  • Exams, given by PSI
  • Continuing education rules

The city and county handle

  • Local business registrations or licenses, if required
  • Local permit rules, so ask the city or county before you begin

Who oversees electricians in New Mexico

Licensing authority

New Mexico Regulation and Licensing Department

505-476-4500

rld.nm.gov, Construction Industries electrical

What the board does

  • Grants and renews the EE-98 and other electrical classifications
  • Approves Qualifying Parties
  • Decides the continuing education rules
  • Takes license applications online

New Mexico electrician license: common questions

How much experience do I need for a New Mexico EE-98 electrician license?

You need 4 years of experience, which is 8,000 hours. On top of that, you must pass four exams and be approved as a Qualifying Party.

What exams do I take for the New Mexico EE-98 electrical license?

You take Business & Law and the EE-98 trade exam, which has three parts: Part 1 (Commercial and Industrial), Part 2 (Residential) and Part 3 (Specialties). PSI gives the exams, and the passing score is 75%.

Is the New Mexico electrician license exam open book?

It is. Approved references are allowed, and you can tab and highlight them.

Can I take the NASCLA exam for a New Mexico electrician license?

You can, as of January 2023, if another state has licensed you for 1 year or more. Business & Law is still required.

Does New Mexico have electrician license reciprocity?

It does for journeyman licenses, with Alaska, Arkansas, Colorado, Idaho, Montana, Nebraska, Oklahoma, South Dakota, Texas, Utah and Wyoming. Electricians licensed in other states can get the EE-98 through the NASCLA exam route.

What work does a New Mexico EE-98 electrical license cover?

Any wiring at 5,000 volts, nominal, or less, along with ES-1, ES-2, ES-3, ES-7 and ER-1 work and the trenching and ductwork that goes with EL-1. Other EL-1 work isn’t included.

How many CE hours does a New Mexico electrician license require?

This license requires 16 hours of continuing education.

Where this information comes from

  1. New Mexico Regulation and Licensing Department, Construction Industries electrical
  2. PSI, New Mexico exam catalog
  3. New Mexico Electrical Code, 14.10.4 NMAC
  4. PSI, New Mexico licensing fees (PDF)
  5. PSI, New Mexico contractor examinations candidate information bulletin (PDF)
  6. PSI, NM CID contractor license application (PDF)
  7. PSI, NM CID Qualifying Party certificate application (PDF)
  8. New Mexico Regulation and Licensing Department, Apply for a Construction Industries license

Last updated October 27, 2026. Spot something out of date? Tell us.

Linden Prep is an independent exam prep and continuing education company. It is not affiliated with the New Mexico Regulation and Licensing Department.