Minnesota Low Voltage License: Requirements, Exam and How to Apply, Minnesota Low Voltage License, Minnesota, Power Limited Technician, Minnesota Department of Labor and Industry, how to get a Minnesota Low Voltage License, Minnesota Low Voltage License requirements, Minnesota Low Voltage License exam, Minnesota licensing board, Minnesota contractor license, license application steps, exam reference books, PLT exam, Technology circuits only, Experience in total, Installing and wiring technology circuits, Planning installs, Repair and maintenance

Home Licenses Low Voltage License Minnesota

Power Limited Technician · Technology Circuits

Minnesota Low Voltage License: Requirements, Exam and How to Apply

In Minnesota, low voltage work falls under the Power Limited Technician license. This guide covers the experience you’ll need, how the exam is set up and what it takes to stay licensed.

Last updated October 27, 2026 from Minnesota Department of Labor and Industry requirements

Exam time

5.5 hrs

A single open-book exam with 80 questions

Time to get license

~3 yrs

You need 36 months of qualifying work

Continuing ed

16 hrs

Due before every 2-year renewal

Do you need a Minnesota low voltage license?

It is if you install technology circuit work in Minnesota or supervise it. The Minnesota Department of Labor and Industry (DLI) issues the Power Limited Technician license, which covers the equipment, apparatus and wiring for technology circuits and systems.

You need the license when

  • You put in, change or fix the equipment, apparatus or wiring for technology circuits or systems
  • You lay out or plan that kind of work
  • You oversee other people doing it

Exceptions

  • We couldn’t confirm any exemptions, so talk to DLI before doing technology circuit work unlicensed
  • Other Minnesota electrical licenses cover work beyond technology circuits, such as power wiring

Penalties for working without a license

The sources we checked don’t give penalty amounts. DLI enforces the state’s electrical licensing laws and can act against anyone doing licensed work without the proper credential.

How to get a Minnesota low voltage license in 6 steps

  1. Get your experience Before applying
    You need 36 months of work on technology circuits, and 12 months or more of that must be hands-on installing and wiring. Up to 12 months can come from an approved 2-year electrical program.
  2. Apply with DLI Notarized application
    Send the Minnesota Department of Labor and Industry your application, filled out, signed and notarized, along with the fees.
  3. Wait for your approval letter Before booking
    You can’t book the exam until DLI lets you know you’re approved to sit for it.
  4. Book and pass the exam Exam day
    Schedule on the state board website. You’ll have 5.5 hours for 80 open-book questions and must score 70%. The code book is supplied by the testing agency.
  5. Apply for the license Once you pass
    After the exam, DLI sends a letter explaining how to apply for your actual license.
  6. Renew every 2 years 16 CE hours
    The license is good for 2 years from the day it’s issued. Complete 16 hours of continuing education ahead of every renewal.

Minnesota low voltage application checklist

Everything for the Minnesota application on one page

  • Documented 36 months of work on technology circuits
  • 12 months or more of hands-on installing and wiring
  • Application, signed and notarized, with fees
  • Approval letter from DLI before booking the exam
  • A 70% or better on the open-book exam
  • License application, following DLI’s letter after the exam

The Minnesota low voltage license

There’s just one credential on this page: the Power Limited Technician license, which covers technology circuits and systems.

PLT Low voltage

Power Limited Technician

Plan, lay out, supervise, install, change or repair the electrical equipment, apparatus and wiring used in technology circuits or systems.

ExamPLT exam, 80 questions
LimitTechnology circuits only

Minnesota low voltage license requirements

The total is 36 months of experience, though different kinds of work earn different credit. Most of it should be hands-on wiring.

RequirementPower Limited Technician
Experience in total36 months
Installing and wiring technology circuitsAt least 12 months, with up to 36 months of credit
Planning installsCredit for up to 6 months
Repair and maintenanceCredit for up to 24 months
Line workDoesn’t count
Credit for schoolAn approved 2-year electrical course after high school can count for up to 12 months (2,000 hours)
Exam80 questions, pass with 70%
ApplicationNotarized and signed, sent with fees

The Minnesota low voltage exam

You take a single open-book exam. On test day the testing agency gives you the code book, so practice looking things up in the NEC quickly.

Format

Open book

Questions

80

Passing score

70%

Exam vendor

Not stated

Scoring and content

  • 5.5 hours for 80 questions; you pass with 70%
  • NEC Chapters 1–9, Chapter 8 communication systems included
  • Applied electrical theory plus electrical equipment and systems
  • Uses the 2026 NEC as of July 1, 2026 (it used the 2023 NEC before then)
  • You can’t bring your own course materials; the testing agency supplies the code book

Retakes

  • We couldn’t confirm the retake rules
  • The state has to approve you before you can book
  • Test centers are spread across the state’s bigger cities
  • Check with DLI on retake rules before you schedule

Books and codes for this exam (open book)

The Minnesota Power Limited Technician exam is open book and based on the National Electrical Code. The testing agency provides a copy of the code book for use during the exam, so your own copy is for studying and getting familiar with where things are.

ReferenceEditionHow it’s used
NFPA 70: National Electrical Code (NEC)2026Allowed in exam
Minnesota Statutes chapter 326B (Electrical Laws and Rules)Not statedNot stated

Exams were based on the 2023 NEC until July 1, 2026, when they moved to the 2026 NEC.

Prep for the Minnesota low voltage exam

Our exam prep course, Total Prep and complete bundle for the Minnesota low voltage exam. Prices are coming soon.

Books for this exam

Renewing your Minnesota low voltage license

The license lasts 2 years from its issue date. Before each renewal, finish 16 hours of continuing education and pay the $53 fee (a late renewal adds $20).

Renewal cycle

Every 2 years

CE hours

16

Renewal fee

$53

Late penalty

$20

Licensed in another state?

We couldn’t find any reciprocity agreements for this license.

No reciprocity agreements

None are listed in the sources we checked. Check with DLI first, then expect to apply as a new candidate: show your 36 months of experience and pass the Minnesota exam.

City and county rules in Minnesota

The state issues your Power Limited Technician license, but each job still needs local permits and inspections.

The state handles

  • Power Limited Technician licenses
  • Approving exam candidates
  • Continuing education and renewals
  • Enforcing electrical licensing laws

The city and county handle

  • Local permits
  • Local business licenses

Who oversees power limited technicians in Minnesota

Licensing authority

Minnesota Department of Labor and Industry

651-284-5012

dli.mn.gov construction codes and licensing

What the board does

  • Looks over applications and clears candidates for the exam
  • Grants and renews Power Limited Technician licenses
  • Decides the continuing education rules
  • Runs Minnesota’s electrical licensing laws

Minnesota low voltage license: common questions

What does a Minnesota power limited technician license cover?

It’s the state’s low voltage license. It lets you plan, lay out, supervise, install, change or repair the equipment and wiring for technology circuits or systems.

How much experience do I need for a Minnesota power limited technician license?

You need 36 months in total. Hands-on installing and wiring of technology circuits has to make up 12 months or more, and an approved 2-year electrical program can count for as much as 12 months.

Is the Minnesota power limited technician exam open book?

It is, and the testing agency supplies the code book. There are 80 questions, you have 5.5 hours, and the passing score is 70%.

Which NEC edition is the Minnesota power limited exam based on?

As of July 1, 2026, it follows the 2026 NEC. It used the 2023 NEC before that date.

How often do I renew a Minnesota power limited technician license?

Every 2 years, counted from the license’s issue date. You need 16 hours of continuing education ahead of each renewal.

Does line work count toward Minnesota power limited technician experience?

It doesn’t. You get zero months of credit for line work toward the 36 months.

Where this information comes from

  1. Minnesota Department of Labor and Industry, Construction codes and licensing
  2. Minnesota Statutes chapter 326B, electrical laws (PDF)
  3. Minnesota DLI, CCLD licensing fee schedule (PDF)
  4. Minnesota DLI, Personal Electrical License Examination Application (PDF)

Last updated October 27, 2026. Spot something out of date? Tell us.

Linden Prep is an independent exam prep and continuing education company. It is not affiliated with the Minnesota Department of Labor and Industry.