Arizona HVAC License: Requirements, Exam and How to Apply, Arizona HVAC License, Arizona, Residential Air Conditioning & Refrigeration, Commercial Air Conditioning & Refrigeration, Dual Air Conditioning & Refrigeration, Comfort Heating, Ventilating, Evaporative Cooling, Evaporative Cooling & Ventilating, Boilers, Steamfitting & Process Piping, Retake policy, Arizona Registrar of Contractors, how to get a Arizona HVAC License, Arizona HVAC License requirements, Arizona HVAC License exam, Arizona licensing board, Arizona contractor license, Experience

Home Licenses HVAC License Arizona

HVAC License · Residential, Commercial & Dual

Arizona HVAC License: Requirements, Exam and How to Apply

Arizona has three groups of HVAC contractor classifications: air conditioning and refrigeration, comfort heating and ventilating, and boilers and steamfitting. Below are the experience, exams, bonds and steps the Arizona Registrar of Contractors requires for each.

Last updated October 27, 2026 from Arizona Registrar of Contractors requirements

Exam time

Varies

Each trade exam runs 75–210 min, and you also take the SRE

Time to get license

~2–4 yrs

C-58/CR-58 takes 2 yrs; A/C and boiler classes take 4 yrs

Continuing ed

Not required

You don’t need CE to renew

Do you need an Arizona HVAC license?

Yes. The Registrar of Contractors (ROC) licenses HVAC contracting in Arizona. You need a classification that fits the work you do, and your business needs a qualifying party who has passed both the trade exam and the SRE (Statutes and Rules Training Course and Exam).

You need the license when

  • Your work is repairing or installing heating, ventilating, evaporative cooling, refrigeration or comfort air conditioning systems (R-39/R-79, C-39/C-79, CR-39/CR-79)
  • Your work is installing, repairing or altering gas-fired furnaces, space heaters, warm air heating, evaporative cooling units or ventilation (C-58/CR-58)
  • Your work is installing, repairing or altering boilers, process piping, or hot water and steam systems (C-4/CR-4)
  • You include solar equipment in your HVAC/R jobs, so you need a -79 class rather than a -39

Exceptions

  • We couldn’t confirm any exemptions. Check with the ROC before you take on work unlicensed.
  • No class here allows you to install a new sub-panel or service panel, but you can add a new circuit to a panel that’s already there

Penalties for unlicensed work

The sources we checked don’t give penalty amounts. The ROC is the licensing agency, and it can act against anyone who contracts without the correct classification, so be licensed before you bid or start a job.

How to get an Arizona HVAC license in 7 steps

  1. Choose a classification Before you start
    Decide between residential, commercial and dual, then whether you do solar (-79) or not (-39). Boilers call for C-4/CR-4. If you only do heating and ventilating, C-58/CR-58 works.
  2. Show your experience Before you apply
    Collect proof of 4 years of managerial or hands-on experience (2 years if you’re applying for C-58/CR-58).
  3. Set up your business Before you apply
    The license has to go to a legal entity, so form one.
  4. Pass a trade exam through PSI Exam day
    Book through PSI or by phone at 855-744-0310. You can bring books to the trade exams, which are given at test centers in Arizona’s bigger cities. Pass before you apply.
  5. Finish the SRE Online
    The Arizona Statutes and Rules Training Course and Exam is offered by the ROC, online only.
  6. Arrange your bond and background checks Before you apply
    Get a surety bond that matches the gross volume you expect, and turn in a background check for each person on the application.
  7. Apply through the ROC Final step
    Follow the checklist at roc.az.gov/get-a-license-checklist to send in your application.

Arizona HVAC application checklist

Arizona’s application on one page

  • Proof of the 2–4 years of experience your class needs
  • A passing score on the PSI trade exam
  • The Statutes and Rules Training Course and Exam, done
  • A legal business entity
  • A surety bond that fits your gross volume
  • A background check for each person on the application

Arizona HVAC license classes

HVAC licenses in Arizona come in residential (R), commercial (C) and dual (CR) versions. The -39 and -79 classes cover identical A/C and refrigeration work, except that solar equipment is only in -79.

R-39 / R-79 Residential

Residential Air Conditioning & Refrigeration

Heating, ventilating, evaporative cooling, refrigeration and comfort air conditioning in homes. The R-79 version also covers solar equipment.

ExamA/C & Refrigeration (+ solar for R-79)
LimitNot stated

C-39 / C-79 Commercial

Commercial Air Conditioning & Refrigeration

Covers ventilation, controls, refrigeration, evaporative cooling, testing and balancing, and wet, dry and radiant heating. The C-79 version adds solar.

ExamA/C & Refrigeration (+ solar for C-79)
LimitNot stated

CR-39 / CR-79 Most flexible

Dual Air Conditioning & Refrigeration

One license that pairs the residential R-39/R-79 scope with the commercial C-39/C-79 scope. The CR-79 version adds solar.

ExamA/C & Refrigeration (+ solar for CR-79)
LimitNot stated

C-58 Commercial

Comfort Heating, Ventilating, Evaporative Cooling

Gas-fired furnaces, space heaters, warm air heating, evaporative cooling units and ventilation.

ExamC-58/CR-58 exam
LimitNot stated

CR-58 Dual

Evaporative Cooling & Ventilating

Pairs the commercial C-58 scope with the residential R-39R scope for ventilating, evaporative cooling and warm air heating.

ExamC-58/CR-58 exam
LimitNot stated

C-4 / CR-4 Boilers

Boilers, Steamfitting & Process Piping

Boilers, plus their burners, flues, controls, and fuel and water lines, along with process piping and hot water and steam systems.

ExamC-4/CR-4 exam
LimitNot stated

Requirements for each Arizona HVAC class

All classes require a surety bond, a legal entity, background checks, the SRE and a trade exam. Where they differ is experience: C-58/CR-58 takes 2 years, and every other class takes 4 years.

RequirementA/C & Refrigeration (-39/-79)Heating & Ventilating (C-58/CR-58)Boilers (C-4/CR-4)
Experience4 years, managerial or hands-on2 years, managerial or hands-on4 years, managerial or hands-on
Trade examA/C & Refrigeration (+ solar for -79)C-58/CR-58 examC-4/CR-4 exam
Statutes & Rules (SRE)RequiredRequiredRequired
Background checkEveryone on the applicationEveryone on the applicationEveryone on the application
BusinessLegal entityLegal entityLegal entity
Surety bondR: $4,250 or $7,500; C: $2,500–$50,000; CR: the two together$2,500–$50,000, based on gross volume$2,500–$50,000, based on gross volume
Continuing edNot requiredNot requiredNot required

The Arizona HVAC exam

Each classification has its own trade exam, and everyone also takes the online SRE. If you’re in a -79 class, add a short solar exam. You can bring books to the trade exams, so get used to looking answers up in the allowed references.

Format

Open book, test center

Questions

30–80 by exam

Passing score

70%

Exam vendor

PSI

Scoring and content

  • A/C & Refrigeration (-39/-79): 210 minutes for 80 questions
  • Solar add-on (-79): 75 minutes for 30 questions; 70% passes
  • C-58/CR-58: 150 minutes for 60 questions; 70% passes
  • C-4/CR-4: 120 minutes for 50 questions; 70% passes
  • The PSI Candidate Information Bulletin lists the references, including OSHA 1926 and the 2018 International Mechanical Code and 2018 International Fuel Gas Code

Retake policy

  • Each try costs the $66 exam fee. You wait 30 days between retakes, and after 3 attempts that wait becomes 90 days
  • Book with PSI at 855-744-0310
  • Mark up your books ahead of time if you like; writing in them during the exam isn’t allowed
  • For the latest retake rules, see the PSI Candidate Information Bulletin

Books and codes for this exam (open book)

The C-58/CR-58, C-4/CR-4 and air conditioning and refrigeration trade exams are open book (the C-4 and air conditioning exams are described as partially open book), and you can bring the permitted references below. You can annotate your books before the exam, but you can’t write in them during the exam.

ReferenceEditionHow it’s used
International Fuel Gas Code (IFGC)2018Allowed in exam
International Mechanical Code (IMC)2018Allowed in exam
International Plumbing Code (IPC) — C-58/CR-58 and air conditioning and refrigeration exams2018Allowed in exam
OSHA 29 CFR 1926: Safety and Health Regulations for ConstructionNot statedAllowed in exam
Manual D: Residential Duct Systems — C-58/CR-58 exam3rd editionStudy only
Manual J: Residential Load Calculation — C-58/CR-58 exam8th editionStudy only
Modern Refrigeration and Air Conditioning — C-58/CR-58 and air conditioning and refrigeration exams22nd editionStudy only
Low Pressure Boilers — C-4/CR-4 and air conditioning and refrigeration examsNot statedStudy only
Pipe Trades Handbook (IPT) — C-4/CR-4 examNot statedStudy only
Modern Hydronic Heating: For Residential and Light Commercial Buildings — C-4/CR-4 exam4th editionStudy only

The ACCA duct calculation slide rule is also not allowed in the C-58/CR-58 or air conditioning and refrigeration exams.

Prep for the Arizona HVAC exam

Our exam prep course, Total Prep and complete bundle for the Arizona HVAC exam. Prices are coming soon.

Books for this exam

Renewing your Arizona HVAC license

You don’t need any continuing education to renew in Arizona. Renewal comes every two years. R classes pay $270 plus a $270 Recovery Fund assessment, C classes pay $480, and CR classes pay $380 plus $270. Miss the deadline and you owe a $50 penalty.

Renewal cycle

Every 2 years

CE hours

Not required

Renewal fee

$480–$650

Late penalty

$50

Licensed in another state?

California, Nevada and Utah have reciprocity agreements with Arizona. We couldn’t confirm exactly what each agreement waives, so check with the ROC before applying.

California: reciprocity agreement

Find out from the ROC which exams your California license and classification let you skip.

Nevada: reciprocity agreement

Find out from the ROC which exams your Nevada license and classification let you skip.

Utah: reciprocity agreement

Find out from the ROC which exams your Utah license and classification let you skip.

Every other state: no agreement

You apply as a new applicant, finish the SRE and pass the trade exam.

City and county rules in Arizona

The ROC license is good statewide. Each job’s permits and inspections still go through the city or county.

State handles

  • HVAC contractor licenses and their classifications
  • The SRE and PSI trade exams
  • Background check and bond rules
  • Discipline and renewals

City and county handle

  • Building and mechanical permits
  • Inspections on the job site
  • Local business licenses, if your area requires one

Who oversees HVAC contractors in Arizona

Licensing authority

Arizona Registrar of Contractors

roc.az.gov/get-a-license-checklist

What the board does

  • Issues contractor licenses and handles renewals
  • Defines each classification and its scope of work
  • Offers the Statutes and Rules Training Course and Exam
  • Sets the bond and background check rules

Arizona HVAC license: common questions

Arizona R-39 vs. R-79 HVAC license: what’s the difference?

Both cover residential refrigeration and A/C work. The R-79 adds solar equipment, so you also take the 30-question solar exam.

How much experience do I need for an Arizona HVAC license?

The A/C, refrigeration and boiler classes need four years of managerial or hands-on experience. For the C-58/CR-58 heating and ventilating license, it’s two years.

Is the Arizona HVAC license exam open book?

Yes, you can bring books to the PSI trade exams. Mark them up ahead of time if you want, because you can’t write in them once the exam starts.

What score do I need to pass the Arizona HVAC exam?

The solar, C-4/CR-4 and C-58/CR-58 exams all take 70%. We couldn’t confirm the passing score for the 80-question A/C and refrigeration exam.

What is the SRE for an Arizona HVAC license?

It’s the Arizona Statutes and Rules Training Course and Exam, which took the place of the old Statutes and Rules exam. The ROC offers it online only.

Do Arizona HVAC contractors need continuing education to renew?

No. You can renew in Arizona without any CE.

Can I transfer an out-of-state HVAC license to Arizona?

Only California, Nevada and Utah have reciprocity agreements with Arizona. Applicants from anywhere else apply as new applicants.

How much is the bond for an Arizona HVAC license?

That depends on your gross volume and class. Commercial bonds range from $2,500 to $50,000, and residential A/C bonds are $4,250 or $7,500.

Where this information comes from

  1. Arizona Registrar of Contractors, Get a License checklist
  2. PSI, Arizona contractor exam catalog
  3. PSI, Arizona Candidate Information Bulletin
  4. Arizona Registrar of Contractors, Statutes and Rules Training Course and Exam (SRE)
  5. Arizona Administrative Code, R4-9-130 Schedule of Fees (PDF)
  6. Arizona Revised Statutes, 32-1126 Fees
  7. Arizona Registrar of Contractors, License and Renewal Fees

Last updated October 27, 2026. Spot something out of date? Tell us.

Linden Prep is an independent exam prep and continuing education company. It is not affiliated with the Arizona Registrar of Contractors.