Missouri Electrician License: Requirements, Exam and How to Apply, Missouri Electrician License, Missouri, Statewide electrical contractor, Retake policy, Missouri Division of Professional Registration, how to get a Missouri Electrician License, Missouri Electrician License requirements, Missouri Electrician License exam, Missouri licensing board, Missouri contractor license, license application steps, exam reference books, Prov or NASCLA, Set locally, Experience, Local license condition, Current and active, Not required, Accepted electrical exam

Home Licenses Electrician License Missouri

Electrical Contractor · Statewide license

Missouri Electrician License: Requirements, Exam and How to Apply

With Missouri’s statewide electrical contractor license, you hold a single license that works across the state rather than one for each city or county. This guide covers who needs it, how you qualify, which exams are accepted and how to apply.

Last updated October 27, 2026 from Missouri Division of Professional Registration requirements

Exam time

3 hrs

The Prov exam; NASCLA’s exam is 4.5 hrs

Time to get license

Varies

4,000–12,000 hours of practical experience, or a local license for 6 of 8 years

Continuing ed

Not stated

Check with the Division before renewal

Do you need a Missouri electrician license?

For many electricians, Missouri’s statewide license is optional. If you only work in places where you already have a local license, or where none is required, you can skip it. It’s worth getting if you want a single license that’s recognized anywhere in Missouri.

You need the license when

  • You’d like a single electrical contractor license that’s recognized statewide
  • Some cities or counties you work in require a local license that you don’t have
  • You don’t want to maintain a separate license for every political subdivision

Exceptions

  • Every political subdivision you work in has no electrical contractor license requirement
  • You work only in places where you already have the local license they require

Penalties for unlicensed work

We couldn’t confirm specific penalties. The Division of Professional Registration can generally refuse a license, discipline a licensee or take other action, and local jurisdictions enforce their own licensing and permit rules.

How to get a Missouri electrician license in 6 steps

  1. Choose your qualifying path Before you start
    Figure out if you’ll qualify through a local license, practical hours, an apprenticeship certificate or a degree, then collect proof of your license history or hours.
  2. Pick an accepted exam Before you apply
    Several electrical exams are accepted in Missouri. Two popular options are the NASCLA Electrical Contractor exam and the Prov Master Electrician exam.
  3. Pass the exam Exam day
    To schedule with Prov, call 866-720-7768; for the NASCLA exam, register through PSI ($125). The exam is open book, and you’ll find test centers in the bigger cities across the state.
  4. Get liability insurance Before you apply
    You need a certificate that shows liability coverage of $500,000 or more.
  5. Apply to the Division
    Submit the completed application with the $200 application fee (it’s non-refundable), proof of your experience or education, your passing exam score and your insurance certificate. You’ll find the forms on the electrical contractor page of the Division’s site.
  6. Get your license After review
    After the Division approves your application, it issues your statewide license.

Missouri electrician application checklist

Your Missouri application on one page

  • A completed application
  • The $200 application fee
  • Proof of your education, experience or both
  • A passing score on an accepted electrical exam
  • A liability insurance certificate for $500,000 or more

Missouri electrician license classes

There’s one statewide electrical contractor license. The local licenses that cities and counties issue continue to exist next to it.

SEC One license statewide

Statewide electrical contractor

Accepted throughout Missouri, so there’s no need for a separate license in every city or county.

ExamProv or NASCLA
LimitNot stated

LOCAL City or county

Local electrical contractor or master license

Issued by a political subdivision in Missouri. Having held one for 6 of the past 8 years is one route to qualifying for the statewide license.

ExamSet locally
LimitNot stated

Requirements for each Missouri electrician class

You can qualify five different ways. On every path, you also need a passing score on an accepted electrical exam and a minimum of $500,000 in liability insurance.

RequirementLocal license pathPractical hours pathApprenticeship or degree path
ExperienceA local contractor or master license held for 6 of the past 8 years12,000 practical hours you can verifyA 4-year EE degree plus 4,000 supervising hrs; an associate’s degree plus 8,000 hrs; or a DOL journeyman certificate plus 10,000 hrs
Local license conditionCurrent and active, with no discipline, and it required an exam based on the NECNot requiredNot required
ExamAccepted electrical examAccepted electrical examAccepted electrical exam
Liability insurance$500,000 minimum$500,000 minimum$500,000 minimum
Minimum ageNot statedNot statedNot stated

The Missouri electrician exam

Several exams are accepted, and you choose one. The two common choices are both open book, so knowing your way around the code book counts as much as knowing the material.

Format

Open book

Questions

60 (Prov) or 110 (NASCLA)

Passing score

70% (Prov) or 75% (NASCLA)

Exam vendor

Prov, or the NASCLA exam

Scoring & content

  • Prov Master Electrician: 70% passes, with 60 questions in 3 hours, based on the 2017 NEC
  • NASCLA Electrical Contractor: 75% passes, with 110 questions in 4.5 hours
  • Subjects cover special occupancies, motors, conductors, raceways, services and feeders, and grounding and bonding
  • You can tab and highlight the approved references

Retake policy

  • We couldn’t confirm the retake rules
  • For waiting periods and fees, call Prov at 866-720-7768; the NASCLA exam through PSI costs $125
  • Many states accept the NASCLA exam, which is useful if you work in more than one state

Books and codes for this exam (open book)

The Missouri electrical exams are open book, and you can tab and highlight the approved reference and use it during the test. The Prov Master Electrician exam is based on the 2017 NEC.

ReferenceEditionHow it’s used
NFPA 70: National Electrical Code (NEC)2017Allowed in exam

Missouri accepts several approved electrical exams, including the NASCLA Electrical Contractor exam, so confirm the code edition in your exam vendor’s bulletin.

Prep for the Missouri electrician exam

Our exam prep course, Total Prep and complete bundle for the Missouri electrician exam. Prices are coming soon.

Books for this exam

Renewing your Missouri electrician license

You renew the statewide license every three years. The triennial fee is $100, reduced from $200 for the 2026 renewal period. We couldn’t confirm any continuing education rules or late penalty, so ask the Division before your license expires, and keep your $500,000 in liability coverage active.

Renewal cycle

Every 3 years

CE hours

Not stated

Renewal fee

$100

Late penalty

Not stated

Missouri electrician CE

Hours, deadlines, required topics and the renewal steps, in one guide.

Licensed in another state?

If you’ve held a license in another jurisdiction for at least one year at the same practice level, Missouri will recognize it.

Any state, territory, DC or the military (license by recognition)

Apply at the same practice level and occupation, showing proof that your license is current and that you’ve held it for at least one year.

NASCLA states (exam accepted)

The NASCLA Electrical Contractor exam is accepted in Missouri, so passing it once can satisfy the exam requirement in multiple states.

City and county rules in Missouri

You can use the statewide license anywhere in Missouri. That said, plenty of cities and counties still run their own inspections, permits and electrical licensing.

State handles

  • Statewide electrical contractor licenses
  • Accepted exams and paths to qualify through experience
  • Proof of insurance ($500,000 liability)
  • Recognizing licenses from other states

City & county handle

  • Local master and electrical contractor licenses
  • Building and electrical permits
  • Inspections
  • Exams for local licenses

Who oversees electricians in Missouri

Licensing authority

Missouri Division of Professional Registration

573-751-0293

pr.mo.gov/electricalcontractors-forms.asp

What the board does

  • Licenses statewide electrical contractors
  • Checks proof of experience, exam results and insurance
  • Handles license-by-recognition applications from other jurisdictions

Missouri electrician license: common questions

Do you need a statewide electrical license in Missouri?

Not necessarily. You can skip the statewide license if you only work in places where you have a local license, or where a local license isn’t required.

How many hours does the Missouri statewide electrical license require?

That depends on the path you take: 12,000 practical hours; 10,000 with a DOL apprenticeship journeyman certificate; 8,000 with an associate’s degree; or 4,000 supervising hours with a 4-year degree in electrical engineering.

Can a local license qualify you for the Missouri statewide electrical license?

It can. You need to have held a local master or electrical contractor license for 6 of the past 8 years, it must have required an exam based on the NEC, and it has to be current with no discipline.

Which electrical exams does Missouri accept?

Several are accepted. Two of them are the NASCLA Electrical Contractor exam (110 questions, 75% passes) and the Prov Master Electrician exam (60 questions, 70% passes).

Is the Missouri electrical contractor exam open book?

It is. Bring your approved references with your tabs and highlights.

How much insurance does a Missouri statewide electrical license require?

You need liability insurance of $500,000 or more, shown on a certificate you include with your application.

Does Missouri accept out-of-state electrical licenses?

It does, as long as you’ve held the license at the same practice level for one year or more. Your application includes proof that the license is current and that you’ve held it for one year.

Where this information comes from

  1. Missouri Division of Professional Registration, Statewide electrical contractor forms
  2. Prov, Missouri Master Electrician exam information
  3. NASCLA, Accredited Electrical Contractor exam
  4. Missouri Office of Statewide Electrical Contractors, Fees
  5. 20 CSR 2117-1.070 Fees, emergency amendment effective June 1, 2026
  6. PSI, Missouri Office of Statewide Electrical Contractors NASCLA candidate information bulletin

Last updated October 27, 2026. Spot something out of date? Tell us.

Linden Prep is an independent exam prep and continuing education company. It is not affiliated with the Missouri Division of Professional Registration.